General Civil Maintenance in Al Ain — Reef Al Ghadeer, Al Ain

General Civil Maintenance in Al Ain

Reef Al Ghadeer carries out civil maintenance in Al Ain: wall crack repair, plaster and render, blockwork, concrete repair and roof and terrace waterproofing. We diagnose the cause at a survey and then give you a free written quote. The office is open Sunday to Friday, 8am to 5pm, with emergency callout 24/7.

Get a free quote WhatsApp a photo

On this page
  1. What we do
  2. Wall cracks: what yours probably is
  3. Waterproofing and why it fails here
  4. How we work
  5. What we will not do
  6. Related
  7. Get a civil issue looked at

Civil work is the fabric of the building: the block, plaster, concrete, screed and waterproofing that everything else is fixed to. When it fails, the finishes fail with it, which is why painting over a civil problem never lasts.

We carry out civil maintenance and repairs for villas, residential buildings and commercial premises across Al Ain.

What we do

  • Wall crack repair in plaster, render and blockwork, matched to what is causing the crack
  • Plaster and render: patching, re-rendering and external render repair
  • Blockwork: new walls, openings formed and closed, boundary wall repair
  • Concrete repair: spalling, exposed reinforcement and patch repair
  • Waterproofing for roofs, terraces, wet areas, planters and retaining walls
  • Roof maintenance: parapets, upstands, outlets and ponding
  • Screeding and levelling
  • External works: paving, kerbs, steps, ramps and drainage falls
  • Making good after mechanical, electrical or plumbing work
  • Non-structural demolition and reinstatement

This page covers repairs. If you are planning bigger changes, our house renovation page covers full and partial villa work, and wet rooms being rebuilt from scratch are covered under bathroom renovation.

Wall cracks: what yours probably is

Cracks are the most common reason people call us, and most of them are not structural. Knowing which kind you have tells you whether it is a morning's work or needs a proper assessment.

Fine hairline cracks in plaster or render. Shrinkage or heat movement in the finish coat. Cosmetic. We cut them out, fill with the right material and finish. Very common in this climate.

Straight cracks along a joint between materials, where block meets concrete or around a column. The two materials expand at different rates. These have to be treated as movement joints, not filled rigid, or they open again.

Stepped cracks following the mortar joints in blockwork. Worth investigating properly.

Diagonal cracks running from the corners of doors and windows. Often heat movement, but not always.

Cracks that are getting wider, that you can fit a coin into, that run through the blocks instead of around them, or that come with doors and windows sticking. Stop. These need assessing before any cosmetic repair.

If we think a crack may be structural, we say so and recommend a structural engineer's assessment before anyone fills it. Filling a structural crack hides the evidence and makes the diagnosis harder later.

Crack typeLikely causeWhat we do
Fine hairline cracks in plasterShrinkage or heat movement in the finishCut out, fill, finish and repaint
Straight crack where block meets concreteTwo materials moving at different ratesForm a flexible movement joint instead of a rigid fill
Stepped crack along mortar jointsMovement in the blockworkInvestigate the cause before repair
Diagonal crack from a door or window cornerOften heat movement, sometimes moreAssess, then repair with reinforcement where suitable
Wide or widening crack, through the blocks, doors stickingPossible structural movementStop cosmetic work and recommend a structural engineer

For a longer explanation of each type, read our wall crack repair guide.

Waterproofing and why it fails here

Roof and terrace waterproofing does most of its ageing on clear, hot days, not in the rain.

UV. Exposed membranes and liquid coatings break down under strong sun, and Al Ain has clear skies for most of the year. An unprotected membrane ages much faster here than the same product under cloud, so UV protection or a covering layer is part of the system.

Daily heat movement. Expansion and contraction every day stress membranes hardest at their weak points: upstands, corners, pipes coming through and the edges where the membrane ends. Nearly every roof leak starts at one of those points.

Rare but heavy rain. The region gets little rain, and much of it comes in short heavy bursts. A roof outlet blocked with a year of dust and sand cannot cope, and water backs up over the upstand. Clearing roof outlets before the cooler months is well worth doing.

Ponding. Water standing on a flat roof after rain means the falls are not working, and standing water finds every weak spot. Damp that gets into a building also brings mould, and the US EPA's guide to mould and moisture puts fixing the water problem first.

How we work

  1. Survey and diagnose: what is failing and why, before we quote a repair
  2. Written quote, with any exclusions stated and anything we could not see noted
  3. Prepare properly: cut back to sound material before any filling
  4. Repair with materials that suit the base and the exposure
  5. Make good and finish, including plaster and paint, all in-house

What we will not do

We will not cosmetically repair a crack we believe is structural.

We will not patch waterproofing where the membrane has failed across the roof. Patching a system at the end of its life means paying twice.

We will not carry out structural alterations without the right engineering input and approvals. Building permits in the emirate sit with the Department of Municipalities and Transport.

See repairs and finished work in our renovation projects in Al Ain gallery. We cover every district, including civil maintenance in Falaj Hazza.

Painting and wall repair · Tiling and flooring · Plumbing · Villa maintenance

Get a civil issue looked at

Send photos to 00971 56 391 3800 · Get a written quote

Frequently asked questions

Is my wall crack serious?

Most are not. Fine hairline cracks in plaster are normal in this climate. Cracks that are getting wider, that you can fit a coin into, that run through the blocks instead of around them, or that come with sticking doors need a proper assessment. Send a photo with something for scale and we will give you a first view.

Why does my crack keep coming back after repair?

Because it is still moving. Filling a moving crack with a rigid filler means it will reopen. It needs a movement joint, or the cause has to be dealt with. Our wall crack repair guide explains the types.

How often does roof waterproofing need renewing?

It depends on the system and how exposed it is, and UV here is severe. We inspect the roof and tell you what condition it is in.

Water is coming through my ceiling after rain. Is that the roof?

Often, but not always. In summer, check the AC condensate drain first. If it follows rain, look at the roof outlets, upstands and pipe penetrations before assuming the whole membrane has failed.

Do you do structural work?

We carry out civil repairs and non-structural work. Anything structural needs engineering input and approvals, and we tell you when a job crosses that line.

Do you make good after other trades?

Yes. Where we did the mechanical or electrical work ourselves, making good is in the quote from the start, not added later as an extra.

Do you do full villa renovation in Al Ain?

Yes, for residential villas. That covers demolition, masonry, plumbing, electrical, AC, tiling, gypsum ceilings, joinery and painting, managed under a civil engineer with 30 years of experience. See our villa renovation page for how a project runs.

Do I need a permit to renovate my villa in Al Ain?

Cosmetic work such as painting, tiling and replacing fittings normally does not. Structural changes, extensions and changes to the facade need municipality approval. We tell you at the survey.

How much does roof waterproofing cost?

The price follows the roof area, the membrane system and how much of the old layer must come off. We inspect the roof and quote in writing.

Covered across Al Ain

Tell us what needs doing

Survey first, written quote second, work third. Nothing starts until you agree the scope and the price.

Call 056 391 3800WhatsAppRequest a quote