Tiling and Flooring in Al Ain — Reef Al Ghadeer, Al Ain

Tiling and Flooring in Al Ain

Reef Al Ghadeer does tile fixing and flooring in Al Ain: new floor and wall tiling, hollow and cracked tile repair, regrouting and external terraces. We tap-test and survey first, then give you a free written quote. The office is open Sunday to Friday, 8am to 5pm.

Get a free quote WhatsApp a photo

On this page
  1. What we do
  2. Why tiled floors fail here
  3. Repair or replace?
  4. How we work
  5. What we will tell you
  6. Related
  7. Get a tiling quote

When a tiled floor lifts, the tiles are rarely to blame. The cause is nearly always the base underneath, the adhesive, or a missing movement joint.

We lay, replace and repair tiles and flooring in villas, apartments and commercial premises across Al Ain.

What we do

  • Floor tiling: ceramic, porcelain, natural stone and large format
  • Wall tiling: kitchens, splashbacks, wet areas and feature walls
  • Tile replacement and repair for cracked, hollow, lifted or missing tiles
  • Regrouting and resealing, including silicone renewal in wet areas
  • Base preparation: screeding, levelling, priming and waterproofing wet areas before tiling
  • External tiling on terraces, steps, pool surrounds and entrances
  • Skirting and trims
  • Other flooring
  • Removal and disposal of old floors

Tiling is often one trade in a larger job. For a whole room or house, see our renovation services, and for new kitchen cabinets and worktops we tile the splashback and floor as part of the kitchen work.

Why tiled floors fail here

Thermal movement. Everything expands and contracts. A floor bonded rigidly across a large area, in a climate with wide daily temperature swings, builds up pressure with nowhere to go. In the end the tiles debond and lift, sometimes suddenly and usually along a line. That is why movement joints are needed at the edges of a room and at intervals across large floors, and leaving them out is the shortcut that costs most.

Outside areas get the worst of it. A terrace or pool surround in direct Al Ain sun gets far hotter than the air, then cools overnight, and moves more than any indoor floor. Outdoor tiling needs the right class of adhesive, the right joint width and proper movement joints. Indoor methods do not hold up outside.

Hollow tiles mean poor adhesive cover. Tap across a floor and you can hear them. Adhesive dabbed at the corners instead of fully bedded leaves gaps, and a gap under a tile is where it cracks the first time something heavy lands on it. Full bedding matters even more with large-format tiles, which are what most people now choose.

Wet areas fail at the waterproofing. Tiles and grout do not keep water out; the waterproof layer underneath does. If a shower has been leaking into the room below, new tiles over the old waterproofing just bring the leak back behind a new finish. Water left behind tiles also feeds mould, and the US EPA's guide to mould and moisture is clear that the water source has to be fixed first.

ProblemLikely causeWhat we do
Tiles lifting along a lineNo movement joint, so heat movement has nowhere to goLift the affected area, form movement joints, relay
Hollow sound when tappedGaps in the adhesive under the tileTap-test the floor, replace hollow tiles that are cracking or loose
Cracked single tilesImpact over a hollow spot, or a crack in the baseCut out and replace, check the base underneath
Grout cracking or washing outMovement, or the wrong grout for the areaRake out and regrout, silicone at junctions
Water showing below a showerFailed waterproofing, a pipe or a waste jointFind the leak before any retiling

Repair or replace?

Repair when the failure is in one spot, you have spare tiles or a close match is acceptable, and the floor around it sounds solid.

Replace when much of the floor sounds hollow, when the failure runs in a line across the room (a sign of movement), when the base itself has failed, or when a wet area needs its waterproofing redone.

We tap-test before quoting. It takes about ten minutes and tells us whether a repair will hold or the problem will spread.

How we work

  1. Survey: the base, the levels, existing failures, wet-area needs, and a tap-test of the old floor
  2. Preparation: removal, levelling, priming and waterproofing where needed. Most of the quality is decided here
  3. Setting out, agreed with you, so cuts fall where they show least and the pattern suits the room
  4. Fixing with full adhesive bedding, the right trowel and movement joints where they belong
  5. Grouting and sealing, with silicone at movement junctions instead of rigid grout
  6. Clean and hand over

What we will tell you

When your old floor is not worth tiling over. Tiling onto a failing floor just moves the problem up a layer.

When we cannot match your tile. Discontinued ranges are common. We tell you before we start, not after the broken tile is lifted.

When the leak is not the tiling. Water showing below a bathroom is often a pipe or a failed waste connection. We check before telling you to retile.

We work across the city, including tile fixing in Falaj Hazza. Finished floors and stone work are in the gallery.

Civil maintenance · Plumbing · Bathroom renovation · Painting and wall repair

Get a tiling quote

Send photos and rough sizes to 00971 56 391 3800 · Get a written quote

Frequently asked questions

Why did my floor tiles lift?

Most often heat movement with no movement joint to take it, or patchy adhesive that left gaps. Now and then the base has failed. The pattern of the damage usually tells us which.

What does a hollow sound under a tile mean?

There is a gap between the tile and the base because the adhesive did not cover fully. It does not always need fixing straight away, but that is where cracks will start.

Can you tile over existing tiles?

Sometimes, if the old floor is fully sound, the levels allow it and the doors still clear. Often it is a false economy. We tap-test and tell you which it is.

Do you waterproof bathrooms before tiling?

Yes. We waterproof every wet area before tiling, and that is where most bathroom leaks are prevented. If the whole room is being redone, our bathroom renovation in Al Ain page explains how the waterproofing, plumbing and fittings are planned together.

How long before I can use the floor?

Usually the next day for walking on, longer before heavy furniture goes back or a wet area is used. We give you the timing for the products we used.

Do you supply the tiles?

We can, or you can supply your own. If you buy them yourself, order extra for cuts and future repairs, because matching later is often impossible.

How much does tiling cost per square metre?

Labour depends on tile size, pattern and how much floor preparation is needed. Large-format and patterned tiles take longer. We measure and quote, with or without tile supply.

Covered across Al Ain

Tell us what needs doing

Survey first, written quote second, work third. Nothing starts until you agree the scope and the price.

Call 056 391 3800WhatsAppRequest a quote