Bathroom Renovation
Bathroom renovation in Al Ain: strip-out, waterproofing, tiling, vanity units and fittings by one team. Free survey and written quote. Call 056 391 3800.
Reef Al Ghadeer does kitchen renovation in Al Ain: new cabinets, granite or marble worktops, sink and appliance plumbing, sockets and lighting, and tiling, planned as one job. We measure the kitchen for free and give you a written quote before work starts. The office is open Sunday to Friday, 8am to 5pm.
A new kitchen is three jobs at once: joinery, plumbing and electrics, with tiling to finish. When they are done by different contractors, the cabinet maker builds around a pipe that is about to move and the electrician has to cut into a new splashback. We plan them together, so the layout, the services and the finishes fit first time.
We renovate kitchens in villas and apartments across Al Ain, from replacing doors and worktops on sound units to stripping out the old kitchen and starting again.
Al Ain is hot and dry for much of the year, and a kitchen adds steam, hot pans and the odd leak under the sink. The material of the cabinet carcass and doors decides how they cope. Each option has a place, and the right answer often mixes them.
| Material | Suits | Watch for |
|---|---|---|
| MDF | Painted or lacquered doors with a smooth finish; stable in dry air | Swells for good if water gets in; every edge has to be sealed |
| Moisture-resistant MDF or board | Carcasses near the sink and dishwasher | Resists damp, but a constant leak will still damage it |
| Plywood | Strong carcasses; holds screws and hinges well | Usually costs more; exposed edges need finishing |
| Aluminium | Sink bases and areas at risk of leaks, as it does not swell | A different look and feel from timber; finish choice matters |
Two points matter whichever you choose. First, sink bases take the most punishment, so they get the most water-resistant material in the kitchen. Second, doors on a wall that catches direct sun through a window need a finish that will not fade or lift in the heat. We go through these with you at the design stage.
Wardrobes, internal doors and furniture repairs are handled by our carpentry team.
Granite is hard, copes with heat from pans and resists stains well once sealed. It is the practical choice for a kitchen that gets heavy daily use.
Marble looks beautiful and stays cool, but it is softer and more porous than granite. Lemon, vinegar and some cleaners can etch a polished surface, so it needs sealing and some care. Many people use marble on an island or a baking area and granite around the hob and sink.
Marble and stone are our strongest work. You can see the cutting, edge profiling and finishing on the counters, vanities, steps and tables in our renovation projects in Al Ain gallery, along with before-and-after kitchen photos.
We template the worktop after the cabinets are fixed, so it is cut to the walls as they are, not as the drawing says they are. Older Al Ain villas are rarely square.
Moving the sink, adding a dishwasher or putting in an island all mean new pipework and drainage. Each needs a proper fall to the drain and isolation valves you can reach.
New appliances need their own circuits. Ovens, hobs, dishwashers and washing machines draw a lot of power, and an older kitchen often has too few sockets on too few circuits. We check the board and the circuits at the survey and add what the new layout needs, with sockets placed where they are safe from water and heat.
Extraction and lighting are worth planning at the same time. A cooker hood that vents outside clears heat, steam and cooking smells far better than one that only recirculates, but it needs a duct route through a wall or the ceiling, which is easy to form during a renovation and hard to add afterwards. Under-cabinet lights over the worktop are wired before the wall units go up, and the gallery's kitchen replacement shows them fitted with new cabinets and counters. If there is a false ceiling, we fit an access panel wherever a duct or drain runs above it.
If you are buying new appliances, the UAE Ministry of Industry and Advanced Technology runs the energy efficiency labelling for appliances sold in the country, which helps you compare running costs.
How long a kitchen takes depends on its size and how much is changing, so we give you dates with the quote. The stages are always the same:
Because the cabinets are made before we strip out, the time without a working kitchen is kept as short as possible.
We do not publish kitchen prices, because the range is wide. What drives the cost:
We measure for free and give you a written quote with each part itemised, so you can choose where to spend.
Kitchens are often part of a wider project. We also handle bathroom renovation and full villa renovation, and new floors are covered under tiling and flooring in Al Ain. As a renovation company in Al Ain, we cover every district, including kitchen renovation in Falaj Hazza.
Carpentry and joinery · Plumbing · Electrical · All renovation services
Send photos and rough sizes to 00971 56 391 3800, contact Reef Al Ghadeer, or get a written quote.
Time goes on measuring and design, making the units in the workshop, then fitting on site. The workshop stage takes longest. We give you dates with the quote.
It depends on where the cabinet sits. Sealed MDF gives a smooth painted door and is stable in dry air. Plywood is stronger and holds hinges well. Aluminium does not swell, so it suits sink bases. Many kitchens use a mix.
Granite is harder and copes better with heat, stains and daily wear. Marble is softer and can be etched by lemon and vinegar, so it needs sealing and care. Some people use marble on an island and granite near the hob and sink.
Yes, if the cabinet carcasses are sound. New doors, hinges, runners or a new worktop can change a kitchen for much less than a full replacement. We check the carcasses first, especially under the sink.
Yes. We plan the new supply and drain runs and any extra circuits as part of the design, so the plumbing and electrics are done before the cabinets go in.
It depends on the size and layout, the cabinet material, the worktop and any plumbing or electrical changes. We measure for free and give you an itemised written quote.
Survey first, written quote second, work third. Nothing starts until you agree the scope and the price.